Optiyol
Blog
November 17, 2026

Your Fleet Is Staffed for Monday: Balancing Delivery Days in Food and Beverage Distribution

Optiyol_Week03_Blog_Cover.jpg

Your Fleet Is Staffed for Monday: Balancing Delivery Days in Food and Beverage Distribution

A distribution fleet is sized for its busiest day, not its average one. The same is true of the driver roster: if Monday needs 28 routes, the depot needs 28 drivers available on Monday, even if Tuesday needs only 20.

That peak has become harder to staff. IRU’s latest driver shortage report puts Europe at about 502,000 unfilled truck driver positions, a shortage rate of 13%, and finds the shortage to be the most pressing concern for 65% of operators [1]. When drivers are scarce, every driver needed only for the peak day is a recruitment and retention problem.

blog_01_drivers_scarce.jpg

Some of that peak is set by a decision distribution teams control: which days of the week each store is visited. Some of it is real demand that has to be delivered on Monday. Both can be planned, in different ways.

The peak is a calendar decision

In store delivery, daily volume follows the delivery calendar. Each store has its visit days, and the sum of those calendars decides how many stops, and therefore how many routes, each day needs.

Calendars also change slowly. A new outlet takes the days that suited the account at the time. A store asks for Monday after a busy weekend. Each change is reasonable on its own, but the week as a whole is rarely re-planned, and over time some days carry far more visits than others.

A worked example

Take a hypothetical depot that makes 2,640 store visits a week from Monday to Friday, with about 22 stops per route. The table shows the visits and routes per day under the current calendar, and under a calendar where the same visits are spread evenly.

Day

Visits today

Routes today

Visits rebalanced

Routes rebalanced

Monday

616

28

528

24

Tuesday

440

20

528

24

Wednesday

572

26

528

24

Thursday

462

21

528

24

Friday

550

25

528

24

Week

2,640

120

2,640

120

Today the depot staffs for 28 drivers, because Monday needs 28 routes. On Tuesday, 8 of those trucks stay in the yard. In the rebalanced calendar every day needs 24 routes, so 24 drivers cover the week.

blog_02_peak_headcount.jpg

Nothing else changes. Every store keeps its number of deliveries, the weekly work is the same 120 routes, and no service commitment moves. Only the days do. The figures are chosen to make the arithmetic easy to follow; they are not a measured result. With anywhere from 20 to 25 stops per route, the same calendars lower the peak by three to four drivers.

What a lower peak changes

A lower peak does not reduce the total work. It changes how much capacity must be held for one day. A depot that staffs for 24 rather than 28 drivers needs fewer drivers to recruit and keep, fewer vehicles on standby, and less reliance on temporary drivers or overtime on its busiest day.

The effect reaches beyond the fleet. Picking and loading teams are also staffed for the heaviest dispatch day, and a steadier week gives drivers a more predictable working pattern, which matters when they are hard to replace.

Option 1: move the days

Where the peak is habit rather than demand, the first option is to move visits to lighter days. A perfectly even week is easy on paper. In practice, moving a store to another day can make a route longer: if no route passes nearby on the new day, the saving in peak capacity is partly paid back in kilometers and hours.

blog_03_move_the_days.jpg

Choosing visit days and building daily routes affect each other, which is why the combined problem has its own name in operations research, the periodic vehicle routing problem, and is considerably harder than routing a single day [2]. A visit pattern that looks sensible for one store can produce poor routes once every other store’s pattern is set alongside it.

Three checks come before any move. Geography: is there a route nearby on the new day? Receiving hours: can the store accept a delivery that day? Order cutoffs: does the order still arrive in time to pick and load? Allowed visit patterns matter too. A store visited twice a week may need its visits spread, such as Monday and Thursday, rather than on consecutive days.

The goal is the calendar that needs the fewest trucks and drivers across the week, with total route time close to today’s. That is usually a lower peak, not a perfectly flat line.

Option 2: plan for the peak

In some operations, Monday is the business. Products that sell strongly over the weekend leave shelves empty by Sunday evening, and the stores need replenishing first thing on Monday. Where there is no Sunday delivery, Monday also carries what would otherwise have gone out the day before. Moving those visits to Tuesday would cost sales.

Then the peak stays, and the question becomes how to carry it with fewer drivers. In the example, Monday keeps its 616 visits. At 22 stops a route that is 28 routes; at 26 stops it is 24. Tuesday to Friday are spread evenly at 506 visits each, which is 23 routes a day at today’s 22 stops, so none of them becomes the new peak.

Three levers raise what a Monday route can carry. The contributions below are illustrative; a real assessment would measure them from route data.

Step

Stops per Monday route

Monday routes needed

Today

22

28

Wider receiving windows on Monday

23 (+1)

27

Longer Monday shift, earlier finishes later in the week

25 (+2)

25

Smaller Monday drops after bigger Friday deliveries

26 (+1)

24

Wider receiving windows reduce waiting at stores whose slots clash, which frees time for one more stop. About one extra hour on Monday adds two stops, allowing for breaks and the return to the depot. Stores with room that take more on Friday need less on Monday, and smaller drops unload faster, which adds one more stop.

The longer Monday is balanced across the week. With 24 drivers every day, Tuesday to Friday routes carry about 21 stops instead of 22, so drivers finish earlier on those days. Monday’s 88 extra stops (616 − 24 × 22) are matched by 88 fewer from Tuesday to Friday (4 × 22), and the peak falls from 28 drivers to 24 without moving a single Monday visit.

blog_04_monday_levers.jpg


More levers for a Monday peak

  1. Wider receiving windows on Monday. Ask the stores with the tightest windows for an earlier or later slot on Mondays only. Fewer window conflicts mean less waiting and more stops per route.
  2. Longer Monday shifts, balanced by earlier finishes later in the week. Drivers work longer on the peak day and go home earlier on the lighter days, so weekly hours stay the same.
  3. Bigger Friday drops where storage allows. Stores with room can take more on Friday, which lowers what has to arrive on Monday and shortens Monday unloading.
  4. Second trips on short routes. Urban routes that finish early can return to reload and run a second loop, so one vehicle and driver cover two routes.
  5. Monday-only capacity. A carrier or rented vehicles can cover part of the peak, without staffing for it every day.
  6. Monday priorities. Serve the stores that run out first early on Monday, and let stores that still have stock move to Tuesday morning.

Longer Mondays must stay within driving and working time rules and be agreed with drivers. In the EU, daily driving time is limited to nine hours, which may be extended to ten hours at most twice a week [5]. In Türkiye, working time can be spread unevenly across the week, up to 11 hours a day, provided the average stays within 45 hours a week over a two-month period [6]. Route time includes stops and loading as well as driving, so both limits need checking.

Days first, frequency second

Changing how often a store is visited is a bigger step than changing which days. Take two hypothetical stores that each sell 20 cases a day from Monday to Saturday, 120 a week. Store A can hold 45 cases; Store B can hold 80.

Pattern

Delivery days

Cases per delivery

Peak stock

Three visits

Monday, Wednesday, Friday

40

40

Two visits

Monday, Thursday

60

60

Three visits fit both stores. Two visits fit Store B but put Store A 15 cases over its limit. Fewer visits also mean bigger drops, which add load to the days that remain and can recreate the peak a calendar change set out to remove. When inventory is planned together with routing, the problem becomes inventory routing, a field with three decades of research behind it [3].

Moving days keeps visit counts, stock levels and service the same, so it is mostly a scheduling conversation. Changing frequency involves store storage, availability and often the sales relationship. Rebalance days first; review frequency second, where storage and demand data support it.

Where we would start

Our recommendation

Count visits by day of week before hiring for the peak. Move the days that can move, and plan days and routes together. For a peak that has to stay, let Monday routes carry more: wider receiving windows, longer Mondays balanced later in the week, smaller drops.

  1. Pull the planned store visits for the last few months, by depot and by day of week.
  2. Convert visits into routes per day using your typical stops per route, and mark the peak day.
  3. Split the peak into two groups: stores that could move (allowed days and receiving hours leave room) and stores that need Monday (weekend stockouts, no Sunday delivery).
  4. Re-plan days and routes together for the first group. For the second, test the levers: Monday windows, shift lengths, second trips and priorities.
  5. Pilot in one depot with an agreed rule for reverting. Track peak drivers, route length, on-time delivery, driver hours and store feedback.

Involve the sales team before any customer is asked to change days or windows, and the drivers before any shift pattern changes. Most of the work is in those agreements; the arithmetic is the easy part.

How Optiyol fits

Optiyol supports both options [4]. For Option 1, it chooses delivery days within each store’s allowed visit patterns and plans the daily routes in the same run, so the current calendar can be compared with alternatives on peak routes and total route time before anything changes on the road.

For Option 2, the levers become planning settings rather than exceptions: shift lengths and receiving windows can differ by day of the week, vehicles can run multiple trips, stores can be prioritized, and extra vehicles can be added for a single day. Once a plan is live, the driver app records actual finish times against the plan, so a longer Monday and the earlier finishes that balance it can be checked against what happened.

Frequently asked questions

Should every day carry exactly the same number of visits

No. Geography, receiving hours and allowed visit patterns usually make a perfectly flat week more expensive in route time. Aim for the fewest trucks and drivers across the week, with total route time close to today’s.

How do we know whether our Monday peak is habit or demand

Look at stockouts and sales by day. If stores that are delivered on Monday would run out on Sunday or early Monday without it, the peak is demand. If their stock would last until Tuesday, the visit can probably move.

Will customers accept new delivery days

Some will and some will not. Start with stores whose allowed days already include alternatives, and involve the sales team before anyone contacts a customer.

What about seasonal peaks

Review the day-of-week balance each season. A calendar balanced in spring can drift out of balance by summer, when beverage volumes rise.

Sources

[1] IRU (30 June 2026). Operators deeply concerned by worsening driver shortage: new IRU report. https://www.iru.org/news-resources/newsroom/operators-deeply-concerned-worsening-driver-shortage-new-iru-report

[2] Francis, P., Smilowitz, K. and Tzur, M. (2008). The Period Vehicle Routing Problem and its Extensions. In Golden, B., Raghavan, S. and Wasil, E. (eds), The Vehicle Routing Problem: Latest Advances and New Challenges. Springer.

[3] Coelho, L. C., Cordeau, J.-F. and Laporte, G. (2014). Thirty Years of Inventory Routing. Transportation Science, 48(1), 1–19. https://doi.org/10.1287/trsc.2013.0472

[4] Optiyol B2B delivery solution. https://optiyol.com/solutions/last-mile-b2b

[5] Regulation (EC) No 561/2006 of the European Parliament and of the Council, Article 6(1). https://www.legislation.gov.uk/eur/2006/561/chapter/II/adopted

[6] Turkish Labor Law No. 4857 (İş Kanunu), Article 63, Working time.

Your Fleet Is Staffed for Monday: Balancing Delivery Days in Food and Beverage Distribution - Optiyol Blog